Power BI custom visuals for project management

Portfolio timelines, RAG status and budget burn: the views a portfolio review walks through project by project.

For PMO leads, programme managers, portfolio analysts. AI-generated, .pbiviz output, source code yours.

By · Founder & Reliability Engineer · Updated

This is the team view: everything project management teams build in Power BI, from visuals to page templates. For a single dashboard job in depth (its visuals, DAX measures and prompts), jump to the 2 project management dashboard jobs below.

Portfolio reporting answers three questions for every project: is it on time, on budget and on scope, and what is at risk next. PMO data comes from a project tool, a finance system for actuals and a status template filled by project managers, usually joined in Power BI on project and period. Native Power BI handles tables, bars and the matrix that holds RAG status. Timelines are the gap: the native Gantt visual Power BI added in October 2026 is in preview and has no dependency arrows or baselines, so portfolio views often end up as images pasted from the planning tool, which go stale the day after the meeting. Budget burn against plan with forecast at completion and a heatmap of RAG status by project and dimension are the other views PMOs sketch.

VizForge generates those as Power BI custom visuals from a description and packages them as .pbiviz files for Power BI Desktop. A generated Gantt binds to tasks with start and end dates from your model, so it updates with every refresh. Describe the grouping (programme, project, workstream), the milestone markers and the today line in the prompt. For the page layout, the Design Studio has a project portfolio template with a sample model. Keep the status vocabulary identical to the project managers' template, so a project marked amber in the status report is amber on the page too.

What project management teams need

  • The native Gantt visual is in preview, without dependency arrows or baselines (as of November 2026); pasted screenshots from the planning tool go stale
  • RAG status is multi-dimensional (schedule, cost, scope, risk); one colour per project hides which dimension is red
  • Budget burn needs plan, actual and forecast at completion on one view
  • Milestones cluster at quarter ends; a calendar view shows the crunch weeks
  • Portfolio reviews go project by project; the visual must drill from programme to project to task

Featured visuals for project management dashboards

Each card links to a full reference page with example prompts, data shape, and DAX measures. Generate any of these in under 5 minutes by describing what you want — no code, no developer time.

Try one of these prompts

Click any prompt below to start a new visual. The prompt opens in your VizForge workspace pre-filled — edit it before generating, or generate as-is.

Example VizForge prompt

Portfolio Gantt chart grouped by programme with RAG-coloured bars, milestone diamonds, a today line and collapsible programme rows.

Try this prompt → starts free

Example VizForge prompt

RAG heatmap: projects as rows, Schedule, Cost, Scope and Risk as columns, each cell showing R, A or G as text as well as colour.

Try this prompt → starts free

Example VizForge prompt

Budget burn bullet chart per project with actual to date, planned to date, budget at completion and forecast at completion.

Try this prompt → starts free

FAQ

Does the Gantt chart update when dates change in the planning tool?

Yes, once the new dates reach your model. The visual draws from the start and end date columns on every refresh.

Can it show dependencies between tasks?

If your model has a predecessor column, describe it in the prompt and the generated Gantt can draw connector lines. Keep dependency views to a single project; portfolio-wide links get unreadable.

How do I keep RAG readable for colour-blind viewers?

Ask for the status letter or an icon inside each cell. The status icons on this site's icon library also work in a native table with conditional formatting.

Is there a free PMO dashboard template?

Yes. The project portfolio template in the Design Studio downloads with a background, theme JSON and a PBIP project with sample data.

Ready to ship your project management dashboard this week?

5 free credits on signup. No card required. .pbiviz output is yours forever.

Generate your first project management visual →

Building for another team? See all teams.

Project Management dashboard jobs

Each page goes deep on one dashboard: the recommended custom visuals, the DAX measures behind them and ready-to-paste prompts.

Free project management dashboard templates

Free Design Studio page layouts for these dashboards: background image, theme JSON and PBIP project, no signup.

Design the page around it, free

A custom visual looks best on a designed page. The free VizForge Design Studio lays out a branded report page at Power BI’s pixel size and exports the background image, a theme JSON and a PBIP project. No signup.

Open the free Design Studio →

Data sources for project management reports

Where this team's data usually lives, and how to get it into Power BI: connector status, the tables to load and KPIs with DAX.

All Power BI data source guides

Synoptic panels for project management

Floor plans and site maps with regions coloured by a measure.

Make the report.
Then make it yours.

The Design Studio, templates and tools are free with no account (exports carry a small VizForge mark until you sign in). Sign up when you want AI: 5 credits on us, no card.

Generated visuals are type-checked and built before you download them; one that fails the quality SLA refunds its credits. See all features or pricing.