Project & PMO · Power BI template
Project Portfolio Power BI template
Power BI project portfolio (PMO) dashboard template with RAG status KPIs, roadmap Gantt slot, value vs effort matrix, status register and budget by programme.
By Nawaf Sharaf · Founder & Reliability Engineer · Updated
Free for commercial useDark version: same layout, colours re-solved and checked for WCAG AA contrast.
BetaOpens in Power BI Desktop with 4 tables of sample data and every built-in visual bound; 1 slot left for a custom visual (Portfolio roadmap). See what’s inside
Free, no sign-up. The PBIP with sample data includes the background, theme and a README. 1920×1080 fits a new page in a Fluent 2 report; 1280×720 and 2× fit Classic pages. Downloads carry a small “Made with VizForge” mark (sign in to the studio to remove it).
- Layout
- Logo header, 4 RAG KPIs, roadmap + value/effort scatter, register + budget bars
- Page size
- 1280×720 px (16:9, Power BI default)
- Theme
- Paper & Clay
Open the sample-data PBIP in Power BI Desktop
Checked against Microsoft Learn's Power BI Desktop projects documentation (as of Nov 2026).
- 1
Unzip to a short path and open the .pbip
Extract the zip to a short local folder such as C:\PBI (Windows limits project paths to 260 characters, and Desktop can't save a project straight to OneDrive or SharePoint), then double-click the .pbip file or use File → Open in Power BI Desktop. Microsoft still lists projects and TMDL as preview features (as of Nov 2026): if Desktop won't open the project, go to File → Options and settings → Options → Preview features, tick “Power BI Project (.pbip) save option” and “Store semantic model using TMDL format”, then restart Desktop.
- 2
Select Refresh once
The project ships without the local data cache (.pbi/cache.abf), so Desktop opens the full model definition without data. Select Home → Refresh: every table is built from values written into its Power Query step, so there is no data source to sign in to.
- 3
Save as .pbix or connect your data
Use File → Save as to keep a single .pbix file, or open Transform data and replace each table's Source step with your own query, keeping the column names so the measures and visuals keep working.
What’s inside the Project Portfolio sample model
Rendered from the same definition the download writes as TMDL, so this list always matches the file.
A 24-project change portfolio in four programmes: status, dates, budget and value/effort scores per project, plus monthly actual cost from Nov 2025 to Oct 2026. Units: US dollars; value and effort scored 1–10.
Tables and columns
Calendar
Date table · 2025–2026, one row per dayDate table generated in Power Query (List.Dates), marked as the model's date table.
- Date (date)
- Year (whole number)
- Quarter (text)
- Month (text)
- Month Name (text)
- Week Start (date)
- Weekday (text)
- Fiscal Year (text)
Programme
Dimension · 4 rowsProgrammes and their executive sponsor.
- Programme (text)
- Sponsor (text)
Project
Dimension · 24 rowsProject register: one row per project with RAG status, dates, approved budget and scoring.
- Project (text)
- Programme (text)
- Sponsor (text)
- Project Manager (text)
- Status (text)
- Start Date (date)
- End Date (date)
- Budget (decimal)
- Value Score (whole number)
- Effort Score (whole number)
Project Cost
Fact · 181 rowsActual cost per project per month.
- Date (date)
- Project (text)
- Actual Cost (decimal)
Relationships
Many-to-one, single direction. Inactive relationships are switched on inside a measure with USERELATIONSHIP.
- 'Project Cost'[Date] → 'Calendar'[Date]
- 'Project Cost'[Project] → Project[Project]
- Project[Programme] → Programme[Programme]
DAX measures
All measures live in a dedicated Key Measures table. Copy any of them into your own model; rename the table and column references to match.
Actual CostCost booked to date.
Actual Cost =
SUM ( 'Project Cost'[Actual Cost] )Format string: $#,0
BudgetApproved budget.
Budget =
SUM ( Project[Budget] )Format string: $#,0
Budget Spent %Actual cost over approved budget.
Budget Spent % =
DIVIDE ( [Actual Cost], [Budget] )Format string: 0%
Projects On TrackProjects reporting green.
Projects On Track =
CALCULATE ( COUNTROWS ( Project ), Project[Status] = "On track" )Format string: #,0
Projects At RiskProjects reporting amber.
Projects At Risk =
CALCULATE ( COUNTROWS ( Project ), Project[Status] = "At risk" )Format string: #,0
Projects Off TrackProjects reporting red.
Projects Off Track =
CALCULATE ( COUNTROWS ( Project ), Project[Status] = "Off track" )Format string: #,0
Value ScoreBusiness value, 1–10.
Value Score =
AVERAGE ( Project[Value Score] )Format string: 0.0
Effort ScoreDelivery effort, 1–10.
Effort Score =
AVERAGE ( Project[Effort Score] )Format string: 0.0
What each visual is bound to
The PBIP opens with these fields already on each visual.
| Visual | Type | Fields |
|---|---|---|
| ProgrammeSlicer | Slicer | Programme[Programme] |
| SponsorSlicer | Slicer | Programme[Sponsor] |
| On trackCard | Card | [Projects On Track] |
| At riskCard | Card | [Projects At Risk] |
| Off trackCard | Card | [Projects Off Track] |
| Budget spentCard | Card | [Budget Spent %] |
| Portfolio roadmapCustom visual | Custom visual | Placeholder for a custom visual |
| Value vs effortScatter chart | Scatter chart | Project[Project], [Effort Score], [Value Score], [Budget] |
| Project status registerTable | Table | Project[Project], Project[Programme], Project[Project Manager], Project[Status], Project[End Date], [Budget], [Actual Cost], [Budget Spent %] |
| Budget by programmeBar chart | Bar chart | Programme[Programme], [Budget], [Actual Cost] |
Questions this dashboard answers
Each one is answered by a visual on the page, from the sample model's own tables and measures.
- How many projects are on track, at risk or off track?
- How much of the approved budget has been spent?
- Which projects offer the most value for the effort?
- Which programmes hold the most budget?
About this dashboard layout
A PMO portfolio page has to work in the steering committee, where it is often printed. The warm Paper & Clay theme and a plain header with the logo make it look like a document rather than a control panel. The four KPI cards are the RAG summary: projects on track, at risk, off track, and percentage of portfolio budget spent.
The roadmap slot is the centrepiece. Power BI added a native Gantt chart in October 2026 (still in preview as of November 2026), so try that first. When it does not cover what the committee asks for (dependency arrows, custom milestone markers, baseline bars), this slot is a good candidate for the AI hand-off: open the template in the design studio, select the roadmap slot and use “Generate this visual with AI” to build a Gantt custom visual sized to the slot. Alternatively use a certified Gantt visual from Microsoft Marketplace (formerly AppSource).
Next to it, a value against effort scatter places each project in a 2×2 (quick wins, big bets, fillers, money pits). Add constant lines at the portfolio medians to draw the quadrants. Below, a status register lists each project with sponsor, phase, RAG, next milestone and budget variance, and a bar chart shows budget by programme.
Store RAG as a status code (1 = green, 2 = amber, 3 = red) in the project table and drive icons and colours from it. Sorting by the code then puts the problem projects first in every visual.
Visuals on the page
Positions are Power BI page pixels. Enter them in Format → General → Properties → Size and position, or use the PBIP download where they are already set.
| Visual | Type | X | Y | Width | Height |
|---|---|---|---|---|---|
| Programme | Slicer | 920 | 24 | 160 | 40 |
| Sponsor | Slicer | 1096 | 24 | 160 | 40 |
| On track | Card | 40 | 120 | 224 | 72 |
| At risk | Card | 352 | 120 | 224 | 72 |
| Off track | Card | 664 | 120 | 224 | 72 |
| Budget spent | Card | 976 | 120 | 224 | 72 |
| Portfolio roadmap | Custom visual | 40 | 240 | 784 | 232 |
| Value vs effort | Scatter chart | 872 | 240 | 368 | 232 |
| Project status register | Table | 40 | 520 | 784 | 160 |
| Budget by programme | Bar chart | 872 | 520 | 368 | 160 |
Custom visuals for this layout
Built-in Power BI visuals cover most slots above. These slots also suit a custom visual; each page covers the data shape, DAX and a prompt to generate it as a .pbiviz.
Slot: On track
KPI CardExecutive dashboard KPI row (revenue, customers, NPS, churn)
Slot: Portfolio roadmap
Gantt ChartProject schedules with phases, tasks, owners, and start/end dates
Already have a report?
Brand Makeover tries Project Portfolio first on every page of your Power BI project (.pbip zip) where it fits: the page's visuals have to go into its 8 data slots without overlaps. Pages it can't seat get another catalog layout or a brand grid. Queries, filters and bookmarks are left as they are. Free, in your browser.
Opens with the Analyst / Dense preset, because the Executive preset doesn't use this layout (8 data slots; this preset uses templates with at most 7).
Restyle my report into thisSwap a slot for a custom visual
Pick any slot and VizForge AI writes a custom visual (.pbiviz, with TypeScript source) sized to it, in this template's colours and shaped for the fields it is bound to.
Generate one that fits this layout.
Custom visual · 784×232 px · custom-visual placeholder
1, 2 or 5 credits depending on the brief · 5 free on signup. Sign in or create a free account on the next screen; the brief is saved for 30 minutes.
A Power BI custom visual titled "Portfolio roadmap". Purpose: Gantt chart: project bars by start and end date, milestones as diamonds, grouped by programme. It sits in a 784×232 px slot on a designed report page. Match the report's brand: data colours #B23A32, #3B4A8C, #A97E27, #6F8F6A, #7C5C8A, #C1734F; background #FFFFFF; text #27211B; font Segoe UI. Transparent visual background so the page design shows through; no visual border.
Not sure what to build? Browse the visual catalog or open the template in the design studio and hand off any slot from there. Or start in the AI generator with a blank brief.
Colours and theme
Warm beige Power BI theme with clay red, indigo and ochre data colours; a softer alternative to grey corporate themes for consulting decks and client reports.
Use the background in an existing report
Prefer to keep your own report? Apply the design to it instead of opening the PBIP.
- 1
Download the background
Take the 1920×1080 PNG for a new page in a Fluent 2 report (the default size for new pages), or the 2× PNG (2560×1440) for sharp text on a 1280×720 Classic page. Power BI scales the image to the canvas.
- 2
Set the canvas background
Format page → Canvas background → Browse. Set Image fit to Fill and transparency to 0%.
- 3
Import the theme
Design ribbon → Import theme (in the Power BI service: View → Theme pane), then pick the downloaded JSON. Data colours and fonts now match the design. Older Desktop builds: View → Themes → Browse for themes.
- 4
Place your visuals
Size each visual to the positions above with background and border off, or open the PBIP project where they are already placed.
Questions about this template
Does the Project Portfolio template come with sample data?
Yes. The “PBIP with sample data” download contains a semantic model with 4 tables and 8 DAX measures, and every built-in visual on the page is already bound to it (Portfolio roadmap stays a placeholder for a custom visual you can generate). The sample: A 24-project change portfolio in four programmes: status, dates, budget and value/effort scores per project, plus monthly actual cost from Nov 2025 to Oct 2026. The data is written into each table's Power Query step, so there is no data source or sign-in.
Is it a .pbix file?
It is a Power BI project (PBIP): a folder of text files that Power BI Desktop opens like a .pbix. Open the .pbip file, select Refresh once to load the sample rows, then use File → Save as if you want a single .pbix.
What visuals are in the Project Portfolio template?
The page has 10 visual areas: 2 slicers, 4 cards, 1 custom visual, 1 scatter chart, 1 table, 1 bar chart. Their exact positions are listed on this page so you can match them in Power BI's Format → General → Properties panel, or skip that step by downloading the PBIP project.
Which theme does the Project Portfolio template use?
It ships with the Paper & Clay theme (light tone). Download the theme JSON here, or open the template in the design studio and switch to any other theme or your own brand colours.
Is there a dark version of the Project Portfolio template?
Yes. Switch the preview to Dark and every download (background, theme JSON and PBIP) comes in that version. The layout is identical; the page, card and text colours are re-solved for a dark page, and the accent, status and data colours keep their hues but are adjusted until text meets WCAG AA (4.5:1) and chart colours reach 3:1 against the cards.
How do I use the background image in Power BI Desktop?
Select the page, open Format page → Canvas background, choose Browse and pick the PNG, then set Image fit to Fill and transparency to 0%. Give your visuals a transparent background and no border so the designed panels show through.
Can I open the PBIP project in Power BI Desktop?
Yes. PBIR is the default report format in Power BI Desktop since September 2026, and the download is a PBIP project: unzip it and open the .pbip file, select Refresh once and the sample data loads into visuals that are already bound (the empty PBIP leaves the containers unbound for your own data). Microsoft still lists projects and TMDL as preview features (as of Nov 2026), so if Desktop won't open it, enable them under File → Options and settings → Options → Preview features.
Dashboard guides that use these visuals
Guides to the same dashboard job: which custom visuals it needs, the DAX behind them and prompts to generate them.
Dashboard job
Best Power BI Visuals for an Executive ScorecardThe best Power BI visuals for an executive scorecard — KPI cards, bullet grids, sparkline rows, SPC quality…
Dashboard job
Best Power BI Visuals for a Sales DashboardThe best Power BI visuals for a sales dashboard: pipeline funnel, KPI cards, bullet charts, territory…
Dashboard job
Best Power BI Visuals for a Real Estate Portfolio DashboardThe best Power BI visuals for real estate portfolio — occupancy heatmaps, NOI bullets, rent roll flow, lease…
Team
Power BI for project managementPortfolio timelines, RAG status and budget burn: the views a portfolio review walks through project by project.
KPI cards for this layout
Headline numbers drawn by one DAX SVG measure each, for the Card visual or a table row.
Designs made for this template’s KPI slots: Completion ring. Browse all styles in the KPI card gallery or build your own in the SVG measure builder.
Related templates
Construction Project Controls
Project & PMO
CV & Portfolio
CV & portfolio
School Attendance & Attainment
Education
Keep exploring
61 hand-designed Power BI page layouts by department.
80 contrast-checked theme JSON files, light and dark.
Page backgrounds at 1280×720 and 1920×1080 with visual positions.
3,034 icons in 40 categories as SVG, PNG, DAX or theme icon JSON.
Make the Project Portfolio template yours
Swap in your brand colours and logo, move panels, add icons and generate missing visuals with AI, then export the background, theme JSON and PBIP project.
The design studio for Power BI. Free, in your browser, no sign-up.